cancel
Showing results for 
Search instead for 
Did you mean: 

Error in prices of contract

former_member222613
Participant
0 Kudos

I have created a local contract in SRM.

However, the materials do not take the price from contract.

The SC take the price in zero when they are created directly in SRM, and the transferred ones of ECC take the price from backend.

some suggestion to solve this issue?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

what is yr tech scenario?

classic or ECS?

you are using local or backend products?

If SC is created with backend products

and tech scenario is CLASSIC with backend pur grp responcible

then if a valid ECC contract is available for the SC product

and source list is maintained for the plant and material in ECC

SRM picks up the ECC contract as source of supply

what is yr requirement?

BR

Dinesh

Answers (2)

Answers (2)

former_member222613
Participant
0 Kudos

Sorry.

I need to create direct PO from contracts, assigning supplier and price of the contract.

Thanks.

former_member222613
Participant
0 Kudos

Hi Dinesh.

I have SRM 5.0 Extended scenario and ECC 6.0.

The local contract is create in SRM and don't exist in the backend.

The materials was create in backend system and envoys to SRM.

Regards.