cancel
Showing results for 
Search instead for 
Did you mean: 

Jump from DAYPR to detailed log

Former Member
0 Kudos

Good Morning Friends,

I am getting an error while running payoll simulation, as Jump from DAYPR to detailed log, incorrect generation of wage types.

here it is Negative time recording

plz help to solve this error

Thanks & Regards

Vani

Accepted Solutions (0)

Answers (3)

Answers (3)

sikindar_a
Active Contributor
0 Kudos

check table T52DZ

and check the wage types

DAypr is the function which is used to integrate pay roll and time management

Former Member
0 Kudos

thanks for the reply

i have checked the wagetypes in table T52DZ

then wat next can u elobrate it plz...

thanks

Former Member
0 Kudos

HI

Run the time evluation live b4 running payroll becoz time data will be updated

if u run time evalution LIVE check tc00 subschema in payroll .check the time data

in PA03

reward the points if useful

Praveen

Former Member
0 Kudos

HI,

maintain tables T52EK, T52EL, T52EM, T52EZ, and T030.

hope this helps.

Check the link properly i'e Wage type mapping

REWARD POINTS