HI BI Expert,

I have got the requirement to delete change log using process chain. I have included the Objecty Type callled Change Log Table and DSO as object name and finally included this process after activating data on DSO process. Whenever, I scheduled the process chain or ran it immediately as well in order to delete change log. But this process does not seem to be working at all. The number of records on change log table is the same as before.

The process chain is as follows;

1. Variant

2. load data to PSA and then DSO

3. Delete PSA data (older than 30 day)

4. Activate DSO Data

5. Delete Change Log (older than 30 day)

Please kindly suggest me what I need to do to make this process working.

Thanks for your help.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 27, 2008 at 03:49 PM

    hi,

    hope u can include all the PSA and change log deletion in different chain and try to trigger the chain weekly, since if u do as in ur chain and if u miss any records and you have to disturb the source again.

    try to delete the change log manually and chk if working.

    Ramesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.