hello!
during creation of a production order i would like to select a reference operation set. i don't have routings connected to the material master.
for selection of the reference operation set, i would like to preset the group for task list which has to be maintained in CA12 too. i found the user parameter and the settings SET/GET parameter in customizing, but still the fields are empty.
thank you for your help!
matthias