May 27, 2008 at 08:43 AM

No source assignment found for cost element 94300020

1115 Views

When I have prepare the process order for the material with the co-product and I am calculating the cost before release of Process Order, system calculate the cost but after release of the order, when I am again going to calculate the cost, system gives the following error on the cost calculation, eventhough I have maintained the cost element in the source structure.

"No source assignment found for cost element 94300020

Message no. KD560

Diagnosis

The sender bears the PI source structure and was debited with costs from the 94300020 cost element. This cost element is not assigned to any source assignment in the 9010 controlling area of the 9010 source source structure.

Procedure

Maintain the PI source structure."