When I have prepare the process order for the material with the co-product and I am calculating the cost before release of Process Order, system calculate the cost but after release of the order, when I am again going to calculate the cost, system gives the following error on the cost calculation, eventhough I have maintained the cost element in the source structure.
"No source assignment found for cost element 94300020
Message no. KD560
Diagnosis
The sender bears the PI source structure and was debited with costs from the 94300020 cost element. This cost element is not assigned to any source assignment in the 9010 controlling area of the 9010 source source structure.
Procedure
Maintain the PI source structure."
Anyone can help on this. Points will be rewarded
Thanks in advance
Regards,
Trushit
M-9879562981