Hi,
I've post GR for Quality Material 10 EA. (Im Master Data in WM2 view I have 10 EA / Palett)
we have 10 EA but 3 EA for inspection lot
After the GR I 've created a TO. In the TO I have 2 positions (the 1st with 3 EA and the 2nd with 7EA) instead 1 Position with 10 EA.
I don't want to split the SU.
Where can I control it so that the system doesn't split the SU after inspection lot.
thanks
Dede