Hi ,
I got a scenario to capture the Scrap w.r.t to each production order so i used the by-product concept. I have maintained the scrap product in BOM with -ive quantity so the 531 mvt is performed and Scrap is getting populated in SCRAP location. I want a clarification in costing part please do suggest me .
we would like to capture the only the half of the cost of the SCRAP material in the location SCRAP. Let me explain
FIN001 is the finished product and RAW001 is the raw material and SCRAP001 is the scrap material code and SCRAP is the location. During the confiramtion of prodction order
Material Mov typ qty
FIN001 101 1
Raw001 261 1.04
SCRAP001 531 0.02
RAW001 531 0.02 as a result SCRAP location got SCRAP001 & RAW001. This i have done because th SCRAP will have 0.04 qty but the cost will be for 0.02 and production order cost will be for 1.02.
Now i want a suggestion in the process is there anyway where i can have single code for scrap material with half of the price . please do suggest me.
Regards
Nisha