Skip to Content
0
Former Member
May 26, 2008 at 10:10 AM

POSTING PERIOD & UDATE relation.--CDHDR

138 Views

Hi,

I am having Posting Period(BDJPOPER) on my selction-screen(Select-options).

Based on the posting period entered on the selection-screen,

i have to retrive changed VBAP-NETWR from CDHDR AND CDPOS.

In CDHDR we are having a field called UDATE.

Based on this UDATE i have to link to BDJPOPER(Posting Period). But these 2 formats are different. how to link these.