HI,
In ERP, BOM explosion could be set to Single, Multi-level or none. All the materials in ERP with single level BOM explosion has to be changed to Multi-level .
Manual conversion of single level to multi level can be done through the path mentioned below:
Configuration profile (CU42)
>select corresponding profile and go to profile detail
-> configuration Initial screen (tab)
>Confign Parameters (sub tab)
->BOM explosion---> select the option for Multi-level.
So i need a conversion program as there are 10k materials in Data Base.
i should implement this in 4.6
Regards ,
Ramesh