Skip to Content
0
Former Member
May 23, 2008 at 06:15 AM

code needed to change single level BOM to multilevel BOM EXPLOSION

126 Views

HI,

In ERP, BOM explosion could be set to Single, Multi-level or none. All the materials in ERP with single level BOM explosion has to be changed to Multi-level .

Manual conversion of single level to multi level can be done through the path mentioned below:

Configuration profile (CU42) >select corresponding profile and go to profile detail -> configuration Initial screen (tab) >Confign Parameters (sub tab) ->BOM explosion---> select the option for Multi-level.

So i need a conversion program as there are 10k materials in Data Base.

i should implement this in 4.6

Regards ,

Ramesh