Assigning Spares to Equipment and Dismantling Faulty Spares from Equipment

How to assign the spares to equipment?

How to dismantle the faulty spare from equipment for refurbishment?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on May 23, 2008 at 03:45 AM

    hi

    spares nothing but materials ,hence you can create BOM for that equipment ,

    if you want to use the dismantle function then you have to represent the spares has equipment ,then you can do the install/dismantle etc

    regards

    thyagarajan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      IB01/IB02 - Create BOM for equipment (IB11/IB12 - Floc BOM)

      - Gives more flexibility to Manage spare part BOM

      CS01/CS02 - Create BOM for material

      (You can add this in Equipment master - Construction type)

      - More useful if same BOM is used for many equipment.

      Hope this helps.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.