You cannot use approp. request type 1 without a project profile

Dear All,

What should i do. I tried to create appropriation request. Error message appears

You cannot use approp. request type 1 without a project profile

Message no. AO257

Please help.

Cheers,

Nies

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 21, 2008 at 12:48 PM

    You create Apr request which can either get replaced with Internal Order or Project/WBS after approving the request.

    For this to happen, you need to have assigned either order type/project profile in the Apr request type.

    Config Node where you maintain this is below:

    Investment Management>Appropriation Requests>Master Data>Control Data>Maintain Appropriation Request Types

    Maintain the profile and set the indicator WBS element as Allowed measure.

    Better refer the Best Practice Configuration Guide available for Investment Management on SAP help portal.

    Regards

    Sreenivas

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      SAP Note 813767 should solve your issue. It says:

      Implement the correction. The system then displays the correct error message AO272 instead of message AO257.

      The actual error is that you want to create an appropriation request for an appropriation request type that does not contain a profile for cost planning. A profile for cost planning is always required.

      In Customizing, complete the profile of the relevant appropriation request type for cost planning.

      Regards

  • author's profile photo Former Member
    Former Member
    Posted on May 21, 2008 at 12:45 PM

    Hi Nies,

    Goto SPRO->Investment Management->Appr Req->Master Data->Control data->Maintain Appropriation Request Types

    Double click your req type, under section Integration in program planning-Allowed measures: It seems only WBS element is selected, specify Project Profile in front of this.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 21, 2008 at 12:47 PM

    Hi,

    Please check in transaction OITL, under influencing field value 1 of the field Appropriation request type, whether project profile is made as 'Required' entry.

    Thanks

    Kishore

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.