on 05-20-2008 4:36 PM
Hi,
After adding a member to a dimension in SAP BPC and processing the dimension, an errormessage is displayed: [REPLINECONS][H1][#CKPIPE54] Parser: The end of the input was reached. (date).
Is there anyone who can tell me what the problem is? How can I remedy this?
We are currently on SAP BPC 5.1
Thank you very much,
sincerely,
Kristoff Mertes
Kristoff
What is the member id you have used? I know BPC has a huge range of "reserved keywords" (I can post them if you like later).
Can you try to (temporarily) change the member ID to something else and simple (e.g. TESTACC01) and reprocess to confirm if the error goes away.
Anis
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check the field length of the dimension file you are processing. Do you have data in a field that exceeds the field length?
Edited by: David Fletcher on May 29, 2008 3:48 PM (Wow! bad spelling)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.