Material Reservation

Dear All,

My client have branches all overr the country.

Lets say 1 branch needs a raw material which is not present in stock. How can the branch intimate the Head office that they need that Raw material so that when the MRP runs that request is also catered.

Cheers.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 20, 2008 at 05:32 AM

    Once reservation created, if stock does not exist it automatically creates PR or PO if MRP exists...

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      MRP we can define re-order point and also safety stock.

      And Lotsize (which is used to calculate procurement quantaties)

      Once the reservation created it automaticall creates PR/PO for that reservation including safety stock. We can define lotsize as per our requirement.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.