inspection plan for all materials GOODS Receipt

Hi qm experts,

I have a scenario. How could I make an inspection plan which covers all materials with variable base unit of measure. Its because my client is using winlims for their results recording. I want to create only one inspection plan to incorporate all materials for assignment, how could I make this one. I hope anybody could answer my question.

Regards,

Edsel matildo

QM Consultant

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    May 20, 2008 at 05:50 AM

    Hi,

    If u r talking about dufferent unit measure ( not bas unit of measure) for all material then it is not possible

    But if it different base unit of measure

    It is simple u go to the creted inspection plan and assign this quality plan from material assignment tab to all material which are having different base unit of measure

    Amol

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      Say u have different materials with different base unit of measure ( kg / ltr / ea / pc / --- -


      etc ) And u have assigned all these material in qulity plan having only one unit of measure (say mm )for characterisrics then there is absolutely no need to maintain conversion rule for all these

      Beacuse base unit of measure is different and unit of measure is different .

      Note Conversion rule is only required if ur using alterenate base unit of measure

      Amol

  • avatar image
    Former Member
    May 20, 2008 at 11:21 AM

    No amol..what i mean is in the task list header. since the task list unit of measure is a required field on that. they should be consistent with the base unit of measure in the material master for a specific materials to be assigned in the inspection plan??my client don't need to attach any characteristics for that inspection plan because they are linked/interface into LIMS.

    Thus, one inspection plan with task list usage goods Receipt can do for all materials..How could I do about this???

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      thanks for all your replies. that's what also i thought even when i ask the question..tnx again...il have to group them according to their base UOM...