cancel
Showing results for 
Search instead for 
Did you mean: 

Quality system refresh in SRM

Former Member
0 Kudos

Hi All,

After the SRM quality system refreshed with production ,what are all the settings we have to check and maintain so that we have connectivity with the backend system.

What are the RFC settings to be maintained and procedure to maintain?

Thank you

Regards,

Yshu

Accepted Solutions (0)

Answers (2)

Answers (2)

dean_hinson2
Active Contributor
0 Kudos

Yshu,

Check OSS Note 564435 - Additional information on CRM System copy and OSS Note 338588 - GUIDs in the master data of different systems. This will guide you through a refresh (copy).

Regards, Dean.

Former Member
0 Kudos

Hi. First set up the RFC destinations as you would normally, then run BDLS to change the logical system from the production one to your qualtity one.

Then, run program RHOMATTRIBUTES_REPLACE to change the attributes that contain logical system, you can use the sub-string checkbox to just change the first part of the attributes.

Finally check your middleware setting, you will probably need to delete the current site and create a new one pointing at the QA system.

Regards,

Dave.