Skip to Content
0
Former Member
May 19, 2008 at 08:11 AM

Period indicator in SLED of batch of material

494 Views

hello,

I have question, where can i see if the plant is link when i change the Period indicator of SLED of my material, because when i make a Production Order, and indicate the batch where the material should came from in the General tab of PO there exist Specific data that show the shelf life exp. date of a material i want it to be populated by the shelf life of the batch of my material. currently the Period indicator of SLED is D (Daily-19.05.2009) i change it into M (monthly-05.2009) but in the Specific Data view in PO it still show format 19.05.2009, where should i make correction so that in my PO i will see 05.2009 in the shelf life date?

Please advice on what should i do.

Thanks and Regards,

JJ