bom zero quantity

bear_boy
Participant
0 Kudos

how do i input a zero quantity in my bom component? my system doesnt allow me to do so. i still need to include the said bom component, for me to view it in the production order

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Please clarify, what's the point of adding the item in the BOM if it wouldn't be use in production anyway? But if I'm guessing that you just need to see the item in the proc orders for display purposes, how about adding the BOM item as Text item, maintain the Item code there, and make the Text item as Production Relevant. In this way, if master recipe/Bom is read at the Proc Ord, BOM will reflect the text item.

Thanks.

Answers (5)

Answers (5)

bear_boy
Participant
0 Kudos

Hello there, when i tried maintaining Item Category "T", the system is again asking me to enter a Quantity.

Former Member
0 Kudos

pl come back

Former Member
0 Kudos

Hello,

As per my understanding your requirement is -


you want to enter the Bom component but the PR should not be generated for the same and the component should not be planned.

You can choose the item category as Text item.

With this you will able to put your item in BOM and planning also wiil not happen.

Please revert if clarification required.

Reward if useful.

Regards,

Ravindra

Former Member
0 Kudos

BOM component quantity can not be zero technically , otherwise there is no point mentioning the component in BOM .

Gurus , what do you think ?

Neal

Former Member
0 Kudos

I fully agree with you, but he wanted it to be present with zero qty in prod order, hence i told hinm to enter comp qty as .001 for a base qty of 1000, which will be almost zero...

hope you got the point

bear_boy
Participant
0 Kudos

dear gurus,

this implementation concerns a pharmaceutical company, which heavily relies on the bom in producing their materials. so a 0 and a 0.0001 is still different. using a text item doesn't help either because they want to see the item code of the material.

Former Member
0 Kudos

Where do you intend to see the Item Code? As it has been mentioned above, you can not enter ZERO as an Item Quantity for a BOM Component.

bear_boy
Participant
0 Kudos

I want to see the item code with zero qty in the BOM, in the production order. It is a critical requirement because there are items with qty of 0 from their legacy system which need to be uploaded via LSMW.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Raf,

Enter the raw material and qty as 0.001 and base qty 1000...then the resultant qty of raw material for 1 unit of base qty will be zero and system consider it as ZERO. The advantage is you will have the item in Production order and qty is negligible.

By doing above system gives a message that resultant qty is ZERO. It is a warning message, hence can be ignored.

Regards,

R.Brahmankar

bear_boy
Participant
0 Kudos

>

> Hi Raf,

>

> Enter the raw material and qty as 0.001 and base qty 1000...then the resultant qty of raw material for 1 unit of base qty will be zero and system consider it as ZERO. The advantage is you will have the item in Production order and qty is negligible.

>

> By doing above system gives a message that resultant qty is ZERO. It is a warning message, hence can be ignored.

>

> Regards,

> R.Brahmankar

i have already done this and system doesnt warn me if i enter or save it!

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Raf,

Please cherck with OPJB.

SPRO-> Shop floor control->Sytem modfications-> Define sytem message attributes.

As you can convert the meassages only defined here.

Regards,

R.Brahmankar

bear_boy
Participant
0 Kudos

>

> Hi Raf,

>

> Please cherck with OPJB.

>

> SPRO-> Shop floor control->Sytem modfications-> Define sytem message attributes.

> As you can convert the meassages only defined here.

>

> Regards,

> R.Brahmankar

what item here relates to the BOM zero quantity warning/error?

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Raf,

Are able to save the bom as per procedure I have given to you? If yes then create the production order if you want any massage there then you will get by this way.

Regards,

R.Brahmankar

Former Member
0 Kudos

what is the item category for the component you want to enter as 0.?

Former Member
0 Kudos

Hi,

If u do want system to create PR/Planned Order for BOM component, Maintain MRP type as ND for that Component.

No need to assign 0 as BOM qty

Pradeep

Former Member
0 Kudos

Can you elaborate your requirement , as to what is the need to put zero quantity?

bear_boy
Participant
0 Kudos

in cs01, i need to put in the component qty field the value of zero. the system is not allowing me to do so.

Former Member
0 Kudos

Dear,

You cannot enter ZERO qty in Qty field, instead you enter .001 qty for 1000 base Qty which is almost zero.

bear_boy
Participant
0 Kudos

but my concern is if it will generate a PR or planned order. i hope not

csaba_szommer
Active Contributor
0 Kudos

Hi,

You can use text item and it will be copied to your PrdOrd from BOM.

http://help.sap.com/saphelp_47x200/helpdata/en/b1/c043f4439a11d189410000e829fbbd/frameset.htm

BR

Csaba

Former Member
0 Kudos

No it will not create PR/Plorder as requirement qty is very less(less than zero)