Skip to Content
avatar image
Former Member

Batch Determination issue -reg

hi friends,

while doing order confirmation at header level , when i went to goods movement , inside that i have selected the material to be issued to production which should undergo 261 movement which is batch managed -


and clicked on

batch determination button -


it is showing the error

"no search strategy could be found "

No search strategy could be found

Message no. LB014

but in SPRO i have maintained all the relevant settings

where exactly i have missed the settings and what and all i have to check if some one can help it would be appreciated

the requirement is urgent please

regards,

madhu Kiran

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

6 Answers

  • avatar image
    Former Member
    May 19, 2008 at 06:19 AM

    Madhu,

    Same Batch Determination is also possible during order creation or Order Change stage in the BOM of an order, try whether it is working over there or not.

    Cheers

    Guna

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      dear guna,

      now as u said i tried at order creation level in the tab BOM ,

      if i select the BOM component line and click on batch determination button , the following information message is shown

      "Batch determination for BMTEST without selection

      data "

      when i click on continue tick mark ,,,,,,,it is going to same screen where it went during batch determination in order confirmation and showing the folowing error

      "strategy contains no selection specifications "

      what shall id o now ? please advice

      MADHU KIRAN

  • avatar image
    Former Member
    May 19, 2008 at 06:25 AM

    Hi,

    I hope u have assiged Batch search procedure for Order Type at OPL8

    Create Batch Search Strategy for OrdType/Plnt/Matl Combination at COB1.

    Now u can excute the Batch determination at Component Overview of Production Order itself.

    Pradeep

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      dear pradeep,

      thanks for ur continuous interaction

      1.for raw material batch determination ,the setting i have done is at SPRO-batch management -valuation-allow and activate batch determination for goods movement in inventory management -


      here i have selected the movement type 101 and done GRN for the raw material --then while doing GRN through MIGO , in the tab batch , "classification " tab has appeared

      with out the above setting it was not coming

      2. for semifinished and finished products , the batch classification settings are done at customizing production scheduler profile which is assigned to material in work scheduling view

      my major doubt is if i select the option batch clasification in background in both the cases how can the system take characteristic values , i am just exploring that and with our interactions we can fix it

      by the by

      could u give some in puts with required settings and action flow for working with PI Sheets

      i have to change to PP-PI industry ,hence in need of ur support

      looking forward for fruit ful interactive relations

      MADHU KIRAN

  • May 19, 2008 at 07:48 AM

    Hy Madhu,

    If You determine the Batch No, at the time of Goods issue(not in Production order or process order component screen) , in that case you have to create another Batch determaitnion strategy through MBC1 which is for Inventory purpose. In this srategy u can create Batch determiantion strategy with combination of Plant, Material type and Movement type.

    Pls try it

    Regards,

    Dhaval

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 19, 2008 at 07:49 AM

    If you want to do the batch determination in the production order you have to create the search strategy in COB1. If you want to do the batch determination during confirmation then you have to create search strategy in MBC1. If in SPRO you have done the setting in COB1 then it will be useful only if you are doing batch determination in the production order . If you have to do batch determination during confirmation then you have to create strategy in MBC1.

    Hope this helps.

    Reward points if useful

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 19, 2008 at 10:33 AM

    Please assign some points if your question has been answered

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jun 24, 2008 at 03:43 PM

    Hi,

    With referance to the same situation, I have a different problem.

    We did OMCG for 261 mvt type & Serach strategy ME001; COB3 for Order Type PP01 and plant X ;and MBC3 for Plant X & Mvt type 261

    I have defined Automatic Batch determination for plant X, and it is working fine.But while doing MFBF or Production Confirmation (CO15) for other plants I am getting the warning message-LB014 Batch search strategy not found.

    Any suggestions on how to limit the Batch determination functionality at plant level X only.

    Thanks in advance

    Siva

    Add comment
    10|10000 characters needed characters exceeded