Test

Hi budys,

plz tell me,how i will test of my scenario is succefully done or not.

with warm regards.

vikash.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

5 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 04:22 AM

    hI,

    yOU CAN TEST YOUR SCENARIO by

    1. testing your mapping ,

    2. performing end to end testing and verifying by SXI_MONITOR or SXMB_MONI

    reward points if helpful....

    PrasHAnT

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 04:29 AM

    Hi,

    u can check from Integartion builder.

    go to tools >Test configuration >in header part specify sender service,interface,namespace and receiver service.

    copy your payload from Message mapping

    note your payload will be in xml format.

    click on run button

    now you can check scenario is succefully done or not.

    reward points if help ful.

    Regards,

    Pradeep A.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 05:44 AM

    Hi,

    We can test our Scenario in the following ways

    1) Test the Mapping in Message Mapping TEST Tab

    2) Test Your Configuration is correct or Not by using this Blog

    /people/paul.medaille/blog/2005/06/24/test-your-xi-configuration-with-the-new-test-tool

    3) And also Test the end-end scenario by placing the file in the source and check in the Target Location, whether the file came or not

    Regards

    Seshagiri

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 05:52 AM

    1)For design part, you will be testing the interface in the test tab itself with all possible values/conditions etc. Here, you wl get to know, how the data is getting transformed etc.

    2)For configuration part, you can test from Tools -> Test Configuration by providing the required information.

    3)For End-to-End Scenario try to trigger the data from source and check for the response

    Note: reward points if solution found helpfull

    Regards

    Chandrakanth.k

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 08:25 AM

    Hi,

    To test the design part,go to test tab and give some data in the source side and check the wheater the target data is correct or not..

    go to tools >Test configuration >in header part specify sender service,interface,namespace and receiver service.

    performing end to end testing and verifying by SXI_MONITOR or SXMB_MONI

    Thanks.

    Soumya.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.