Hi Sapians,

i am dealing with a problem with consignment issue, we did consignent fillup and in mmbe stock shows as a consignment stock, but when we tried to do c.issue i am getting an error saying 0 quantity avail and we are not getting any confirmed schedule lines, if i add the same material in allready pgi order i am getting confirmed dates with no problem.i carried out new avail check but still no confirmed schedule lines, did checked all the options of avail. but nothing works,

I really appreciate if somebody could advise why the hell availability is not carried out here and no schedule line when we have enough stock avail.

thanx in advance guyz.

Mike D

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 04:26 AM

    hi mike

    Please reward points. If you feel this answer suits query to solve the problem

    Hi in consingement business 1st and foremost thing is the consignment fillup

    document type is kb= it is relevant for delivery. In this step you have to sales order and do the delivery with document type

    check stock as consignment in mmbe. schedule line for that E1= movement type 631 relvant for delivery check it

    in issue ke document type; in that it is relevant for delivery and invoice

    check it schedule line in vov6 c1 as movement 633 it should be marked as availability check and relevant for delivery and requirement assembly. you will get inthis step, may this could be the reason check your schedule line category.

    once

    after that delivery and p.g.i after that invoice

    consignement return same it contain or, delivery and credit for returns invoice

    last thing is pickup, i dont have any invoice here you have to pick up the material from the customer loaction to your place

    Thanks & Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 19, 2008 at 05:22 AM

    Hi

    Please check the schedule line category you have assigned. There are two kinds of schedule line categories for this activity, C0 and C1. C0 is without availability check and C1 is with avialability check.

    Thanks,

    Ravi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2008 at 06:18 AM

    Hi Mike,

    Please chech what item category is getting determined for consingment issue, it should be C1 as per standard SAP.

    Please check the schedule line category settings...for the item category C1, the availability check should be flagged and the movement type should be 633.

    Regards,

    David

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.