Dear Friends ,
Please give some solution for following error ,
Cost estimate for material S1 / plant 1000 is incorrect
Message no. CK168
**Diagnosis**
**The system found errors in the cost estimate of material component S1 from plant 1000.**
**System Response**
**The results of raw material cost estimates that have errors are not used in the product just costed. Only cost estimates that do not have errors or that were released are used in cost rollup.**
**All assemblies that contain material S1 from plant 1000 in their structure are indicated as incorrect.**
**The message sets the costing status of the assembly to 'costed with errors'.**
**Procedure**
**Eliminate the error at the highest low-level code.** Regards