hi,
we want to create one pipeline material as per our new requirement for showing gas consumption.during material creation with mat type PIPE, it's showing an error:The field Profit Center is defined as a required field; it does not contain
an entry.
Procedure
If the field is the material group or unit of weight, and the field is not ready for input, check whether the material is locked. If it is locked, you cannot extend the Purchasing view or the Sales view. If either of these views needs to be extended, the material must first be unlocked. This can be done only by a user with special authorization.
thanx,
sheetal