Hi,
I would like to change the characteristics value of variant configured material. It is not allowing me to change the value in the Project builder The Project is assemble to order scenario
There is reference point and configurable material in CJ20n attached to network
While i create sales order based on the settings of standard network i get a pop up for entering the values of characteristics.
The material assigned in sales order is not configurable material.
After saving the sales order the project is created.
Where in the sales order can i change the characteristics value.
Regards
V Manoj