Hi..

We have Rep Mfg scenario , and we want to chk the material while in-process.

In the Mtl Mastr we have maintained Insptn type as 13 .

In Rate Routing we have maintained a operation with control key which requires Insptn characteristics n MIC is assigned in routing.

We have created a Planned order .

Now , requirement is dat system should not allow backflush activity until in-process inspetion rresult is recorded.

Whether Inspetion Lot gets created in Rep Mfg as soon as Planned Order is created..?

How to make the system to accomodate in - process inspection before backflush..?

Please guide me with soln