Hi All,
My client is implementing an equipment cannibalization process wherein spare parts of an equipment on stand-by are removed and transferred to a similar component in need of that spare parts. They require a documentation of these movements since at times these equipment (the ones on stand by) are sold and buyers require a list of spare parts removed or defective parts (from the equipment that used the on stand-by equipment's spare parts) installed in these equipment.
For example. Prime Mover A is on standby when Prime Mover B needed a transmission gear. Maintenance orders the removal of tranmission gear from Prime Mover A and the installation of the same to Prime Mover B. My client documents this manually right now and whats to put it in SAP. Showing the Equipment where the parts came from and where it will be installed.
Can anyone help me figure out a standard way by which I can accomplish this requirement in SAP ECC 6 PM? Im planning to make a new notification type but i cannot configure the view screens to contain the information of such movement.
Thanks for the help.
Andrew