I am mapping the production of a finished product through PS without using the Production order.I am maintaining the standard price of finished product as zero in the material master.
suppose the cost of
Raw Material 1 is 100 INR
Raw Material 2 is 150
Activity cost is 50
So the cost of finished product should be 10015050 =300.
Can anyone please let me know how should I transfer this cost to the finished product?
I want this because at the time of delivery the cost of finished product is zero which is not acceptable.