Hi All,
Is it possible to use Specific Cost in B1. For example, Raw Material RM1 is purchased two times. First time the batch number is RM11 and cost is Rs. 10 per unit. Second Time the batch number is RM12 and cost is Rs. 12 per unit.
Now whenever RM1 is issued for production, it should pick up the cost according to the batch number.
Thanks
Rahul Jain