how to define the routing for one line with 2 parts

Jan 17 at 01:10 AM

35

avatar image
Former Member

Hello,

our production line generately produce 2 parts once in one line. Sometimes there is special, it may produce one part and another is blank. Now the problem is, no matter procude one part or two parts, it always need to run the line, the time is the line running time, 2 parts are sharing same routing group. how to make it be able to no matter produce one part or 2 parts, it always have same production time?