Skip to Content
0
Former Member
May 11, 2008 at 11:37 PM

Assignment of node type in DRP

2333 Views

Hi,

I f I define a Plant in R/3 and didnot define a node type in R/3 SPRO>DRP> Assign node types.

But when I Cifed the material to APO, it is transferred automatically as 1001.

1. How does the system know that it is a Location type 1001? or is it the default?

2. Are there any other settings that help the system decide the location type?

I noticed the R/3 SPRO> Enterprise Structure>Definition>Logistics - General>Define Location.

Thanks.