Hi,
We have created a method (Dataload procedure) for master data Item. But while trying to assign this dataload procedure to a method, we have only totals database and Docuemnts( this is as per our databasis). So we can not assign this master data load procedure to the methos.
So can any one please suggest the steps to upload Item master data through flexible upload?
Thank you,
Praveen