Hi all GURU's
My BOM structure is as follows. The BOM is the multilevel BOM as shown below.
FG-----SFG 1 + RM 1 + RM 2
SFG 1----SFG 2 + RM 3 + RM 4
SFG 2-----SFG 3 + RM 5 + RM 6
SFG 3-----RM 7 + RM 8
All the FG, SFG & RM'S are the batch managed. All the fg & sfg's are maintained at the standard price in the material master.
Now assume that SFG1, SFG2, SFG3, batches are manufactured at the cost which deviate too far form the material master. This may be because excess/lower raw material cosumption & wide variation in the actual activity.
Now I want to know the cost of FG based on the actual costs of SFG & RM"S batches used. How can I do this in SAP.
If anybody can guide me on this will be very thankful to him & full marks will be alloted.
Reagards,
MHP