Hi All,
I have a problem, i want condition type FRC1(Freight) to get added to the material cost during IV.
So i have defined condition type FRC1 in Info record. But during IV freight cost is not getting captured,i have to manually add it.
Please guide how to add freight to the material cost?Is my approach incorrect?
Thanx,
Ritesh