The following errors crop up .. Error messages
Check the definition of cost component 020 in cost component structure 01.
To take the fixed costs into account, set theFixed and variablecosts indicator for the cost component.
Check which cost elements are assigned to this cost component.
2. Call up the cost element itemization for the material costed and for its BOM components, and check those cost elements that contain fixed costs.
When i change it to fixed and variable from variable it does not allow me to do it sayoing i have exceeded the limit of 40 costing fields .. .
PLease help .