Hi all,
Currently, we have set up a work center in our system, which has the following intergration:
- Controlling Area --> TECH
- Cost Center --> TECH001
- Activity Type --> ENGINE
- Plant --> PN01
- Work Center --> PL01
Based on the above, the work center PL01 has the relationship of where Activity Type ENGINE and Cost Center TECH001 are linked together, where Cost Center is tied to Controlling Area TECH.
However, when a user tried to create General Task List (Trxn IA05), under Work Center PL01 and Plant PN01, and inserted Activity Type ENGINE in Operation item. It gives the following error:
Activity Type ENGINE not set up for cost center
I have also checked KP26 that everything is setup correctly.
Please can someone shed some light on the above?
Many thanks and regards,
Patrick
PS: Full point guaranteed for helpful answer.