Hi:
During the process of copying back production ECC and BI to our non production boxes, we are having to reinit and reload all LO related data in the non production boxes as the client requires it to match. As our production system grows, this is becoming a very difficult and timely task to complete both from the data size and the fact that nonprodution boxes are smaller than production boxes
Has anyone found a workable process where the production systems being copied back does not impact your LO extraction or cause you to lose your current status of delta extraction?
We understand what needs to happen, like the ECC queues needing to be empty before the copy starts, but this happens as a 'online' copy of the system so there is no real way to incorporate the need to have all ECC extraction queues and delta queues appropriately empty when the copy takes place.
What the Basis team is doing as post copy activities is deleting all the ECC outbound queues which were looking for the BI production box since it is no longer accurate a system connected.
thanks