Hi all
I am having one material XXXX in the storage type 001 in which SUT check is active.
That is material XXXX is stored on the storage unit type IE1 in the storage type 001.
Now i want to move the material to 002 where the SUT check is not maintained.
Will system allow me to move the material from 001 to 002 storage type.
With Rgds
Vinod