Hi guru's
Can anybody explain why Iam not getting release option at the header level (Usually at header level for P.O.'s) for subcontracting P.O. Please its urgent. If I entered to release the P.O. through me29n then selecting the required document iam getting the message as the document cannot be released.
thanks
tuljasingh.