Hello,
SRM 5.0SP11 ECC 6.0
CLASSIC
Sourcing with Bid Invitation
PO as a follow-on for BI is working fine
Now the task is to create contract as a follow-on.
So we use the BI trans type RFCR with internal no range matching to external no range of MK in ECC contract type.
For transaction type of follow-on doc types for RFCR
our entries are
Trans cat=BUS 2200
Trans type=RFCR
Sub obj type=BUS2000113
follow-up=PCTR
Distribution model is distributed from SRM to ECC with message type BLAREL
Partner profiles are set in SRM & ECC in WE20.
outbound and inbound parameters for SRM & ECC are maintained with message type BLAREL as per config guide.
Ports are correctly defined in WE21
BADI BBP_DETERMINE_LOGSYS points to our backend
but when "create contract" button is clicked for accepted bid
error message "Backend data could not be read"
ECC receives no IDOC.
If we run FM B46B_CTR_CREATE in SRM
for msg ID BBP_BD
we get
Transaction type for backend system not maintained.
But we have mapped ECC contract type "MK" with same no range.
Any thought?
BR
Dinesh
You need to maintain the same document types in both the systems.
Regards, IA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks, Imthiaz.
As per yr suggestion
have created a doc type for contract PCTR in ECC
but still ECC is not receiving any IDOC.
If I run FM BBPV_CONTRACT_CREATE in ECC
and give my SRM system as IV_CALLING_LOGSYS
I am getting message
IDOC (BLAORD03) could not be saved
Also, with this suggestion do you mean to say that
we can create ECC contract only of one doc type
though in SRM we can set multiple in attribute CT_PROC_TY.
Update is that now I am able to create local contract after
the purchaser accepts the bid and clicks on "Create contract".
It is created in "Held" status.
Since we have auto approval workflow for contract no approval is required.
But when the strategic purchaser release the contract, SRM should puch the IDOC (BLAREL) to ECC
it is not happening.
We are not using BADI BBP_CTR_BE_CREATE.
and code in CONTRACT_LOGSYS_DETERMINE
under BADI BBP_DETERMINE_LOGSYS
is
method IF_EX_BBP_DETERMINE_LOGSYS~CONTRACT_LOGSYS_DETERMINE.
DATA: wa_items TYPE bbp_pds_transfer_item.
READ TABLE it_items INTO wa_items INDEX 1.
IF sy-subrc = 0.
cv_logsys = wa_items-be_log_system.
ENDIF.
endmethod.
Can you throw some more light?
BR
Dinesh
Thanks, Imthiaz and all,
We tested with hardcoding
cv_logsys = 'R3DCLNT200'.
(R3DCLNT200 is our backend)
But we are getting error
Backend data could not be read
Summarising the scanario and the revised settings once again:
The business scenario in brief is as follows:
PR will be created in ECC.
It will be transferred in SRM for sourcing.
When the PR is of high value OP purchaser will choose BI type=contract
negotiation.
OP purchaser will fill the required details and publish the BI.
Interested bidders will submit the respone i.e. bid.
Op pur will accept the winning bid.
Out of this accepted BID he wants to create a CONTARCT in ECC ONLY
directly.
The settings we have done:
Number ranges for SRM server purchase contracts have been maintained
as
C4 3400000000 3499999999
C5 3500000000 3599999999
New trans types
ZLQT &
ZLVA
have been created for SRM purchase contract (copying PCTR)
made active and assigned the no ranges C5 & C4 respectively.
Under ECC config->MM->purchasing->contrac->no ranges
this no ranges are available
and marked as external.
In ECC define doc types for contracts
Doc types
ZLQT &
ZLVA
are available and assigned no ranges C5 & C4 as external respectively.
Under trans types config in SRM
Bid invitation trans type
RFCR is made active
assigned internal no range
in the follow-on trans type for this type
entries are
BUS2200 RFCR BUS2000113 ZLQT
BUS2200 RFCR BUS2000113 ZLVA
In the attribute CT_PROC_TY we have NOT maintained the doc type of
ECC contract
SINCE THIS ATTRIBUTE ALLOWS ONE VALUE ONLY.
This is standard or a bug?
BADIs for contract management in SRM & ECC
SRM -
BADI BBP_DETERMINE_LOGSYS (activated)
in method CONTRACT_LOGSYS_DETERMINE
coding:
method IF_EX_BBP_DETERMINE_LOGSYS~CONTRACT_LOGSYS_DETERMINE.
DATA: wa_items TYPE bbp_pds_transfer_item.
READ TABLE it_items INTO wa_items INDEX 1.
IF sy-subrc = 0.
cv_logsys = wa_items-be_log_system.
ENDIF.
endmethod.
BADI BBP_CTR_BE_CREATE (Deactivated-Not reqd)
ECC-
BADI BBP_CTR (Not implemented)
Created a distribution model from SRD200 to R3D200
with message type BLAREL
created partner profile
outbound parameter for SRD200
Message type - BLAREL (Idoc type BLAREL02)
Inbound parameter for R3D200
Message type - BLAORD (Idoc type BLAO)
Message type - BLAREL (Idoc type BLAR)
Message type - COND_A (Idoc type COND)
In inbound process code in ECC WE42
Process code BLAO is assigned to message type BLAORD
Process code cond is assigned to message type COND_A
Ports are available in WE20
WF WS14000086 is active with simple creation date criteria.
After all these settings it is expected that
a contract of selected doc type in accepted bid
should be created
directly in ECC R3D200
But SRM is creating a held contract locally only i.e. in SRD200
Evenafter the strategic purchaser releases this contract
no IDOC is starting from SRM and entering in ECC.
We see that our settings are correct as per config guide.
Then why SRM is not creating contract directly in ECC?
Any new thoughts?
BR
Dinesh
Edited by: Dinesh Powale on May 22, 2008 4:10 AM
Hi Dinesh,
Pls check the foll settings:
1. Business Add-In BBP_DETERMINE_LOGSYS and implement the method
CONTRACT_LOGSYS_DETERMINE for R/3 backend system.
Enter value field of the parameter CV_LOGSYS correctly in the method CONTRACT_LOGSYS_DETERMINE.
2.Determining the Transaction Type for Backend Contracts
In the organizational plan, assign the CT_PROC_TY attribute, for example,
PCTR to the responsible purchasing group.
3. Setting up Organizational Data and Mapping (Master) Data
1. Using transaction PPOMA_BBP, make sure the Purchasing Organization and
Purchasing Group of the backend system exist in the organizational plan.
a. Make sure to link the SRM purchasing organization to the purchasing
organization you use for contracts in the backend system: On the Function tab
under section Local
Select the Purch. Organization indicator
Enter the key of the backend purchasing organization
Enter the key of the logical system (backend)
b. Make sure to link the SRM purchasing organization to the purchasing group you use for contracts in the backend system: On the Function tab under section Local
Select the Purch. Group indicator
Enter the key of the backend purchasing group
Enter the key of the logical system (backend)
Make sure table VENMAP contains vendor data with identical GUID, backend vendor number and logical system.
4. Specifying Number Ranges for Backend Contracts
Maintain an internal number range for backend contracts
Procedure in the R/3 Backend System
1. Setting up the IDoc Inbound Processing
R/3 inbound processing uses different IDocs for creating contracts and conditions.
Transaction Code WE42
Menu Path Tools ® ALE ® ALE Development ® IDoc ®
Inbound Processing ® Define Process Code
...
1. Assign the inbound processing code BLAO for purchasing contracts to message type
BLAORD.
2. Assign the inbound processing code COND for conditions to message type COND_A
2. Creating the ALE Partner Settings
Transaction Code WE20
Menu Path Tools ® Business Communication ® IDoc Basis
® Administration ® Partner Profile
...
1. Create a partner profile for partner type LS (logical system of sending SRM system)
with the following entries and settings under Inbound parameters:
a. Message type BLAORD (for purchasing contracts), Process Code BLAO and
Transfer IDoc immediately activated.
b. Message type COND_A (master conditions, for price determination), Process
Code COND and Transfer IDoc immediately activated
3. Specifying the Document Types for Backend Contracts
Transaction Code OMEF
IMG Path Materials Management ® Purchasing ®
Contract ® Define Document Types
...
1. Choose the transaction type for backend contracts.
2. Enter a number range for external number assignment that is identical to the internal
number range you specified in the SRM system for backend contracts.
BR,
Disha.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Disha,
Thanks for revising the settings from config guide.
But if you had seen my earlier post.
I have done all these settings.
I would like to talk about yr Pt. No.2
If we define contract trans types/Doc types in org attribute CT_PROC_TY
I have observed that we can not specify multiple values.
Have you observed this?
So Alternate is just define the required contract trans type/doc type
under SRM IMG : cross applns :define trans type
and make them active
they will be available for follow-on contract for an accepted Bid
I am doubting my coding in
BBP_DETERMINE_LOGSYS : CONTRACT_LOGSYS_DETERMINE
think SRM is not able to get the backend PORG correctly
which is mandatory for direct backend follow-on contract creation from bidding.
Will keep updated.
BR
Dinesh