Hi all,
We are running MRP every night, manage all our materials with batches, and this batches have valuable characteristics.
The thing is that, depending on those values, one batch should not be ATP avaliable for some certain orders, or in general it's stock should not be considered when calculating the needs of it, depending on the item (material code) wich generated the needs.
For example, for material A we have batch A1 and A2. Material B uses material A, but due to batch characteristics (), none of A1 and A2 should be considered as avaliable for material B. So we would expect our MRP to propose a new order for material A, to satisfy B needs.
In the same example we could have a material C for wich A1 is ok and A2 is not ok, and even a material D for wich both batches are ok.
To sum up. Is there any way to make our MRP 'batch characteristics' compilant ?
I don't know if I've been clear enough,
Edited by: Ernest Lluis Picart on May 8, 2008 9:33 AM