Skip to Content
0
Former Member
May 08, 2008 at 07:19 AM

Middleware problems when Starting Initial Load of objects

28 Views

Hi!

I am having problems when using R3AS and trying to run the Initial Load of objects dnl_cust_basis3, dnl_cust_prod1 and dnl_cust_prod0. When I run the load I get a sysfail in SMQ1. When I look in the backend the system has created a dump which states "No external system (such as CRM) connected". Therefor it looks as if the connection from SRM to backend is working but not from backend to SRM.

Following has been maintained:

SMOEAC is maintained in SRM system

Table SMOFPARSFA maintained in SRM system

Tables CRMRFCPAR, CRMCONSUM, CRMSUBTAB maintained in backend system

RFC destination configured and working both ways using a system user with SAP_NEW and SAP_ALL

Does anyone have a clue what could be the problem?

Sincerely

Anders Öhrling