Skip to Content
0
Former Member
May 08, 2008 at 05:54 AM

Shop Floor Rejection

79 Views

Hello All,

I have made good issue against production order for x material & qty 100 nos.

But during assembly the production manager found 50 nos as a rejected material.

Now how can i get back this material to storage location so that i can send back this rejected material to vendor?

As per my knowldge, i need to do reversal of good issue with mvt type 262 & once the material comes in storgae location then i have to do transfer posting for puting this material in to block stock.

After that i have to prepare return delivery with mvt type 122.

Is this is the right procedure?

Please guide me.

Thanks in advance.

Shailesh