Hi ,
I need to copy a release strategy of a particular plant to 6 other plants in SPRO.
One way is to copy it 1-by-1 manually, but since there are 143 material groups of the plant from which i have to copy ,this becomes a very lengthy process.
That means copying 143 material groups from the plant to 6 other plants.
I tried taking ABAP help if a program could be written about it, but in vain.
Can anyone tell me some other method which would take little less time.