Hi all,
First of all, I'm using Industry Process.
I wouldn't like to work with Backflush to make the material movements manually later, but I don't get it.
Master Data's:
Material master data: Backflush: "2 - Work Center decides"
Work Center (Resource), the Backflush is not marked
In the Process Order, in the BOM, the flag is not market too
The only strange thing I realised is in the Recipe, the material IS NOT assigned to any operation/phase. But, when I did the Process Order, the systems did an assignment automatically to the first operation. Is when I confirm that operation when the system did automatically the movement.
Anybody knows why is this assignament done? In a process order, the materials have to been allways assigned?
Thank's in advance!!
Roger