Dispatching Labor capacity

Dear Experts,

We have a work center with capacity category 001 for machine and 002 for labour which defined as labor pooled capacity X1. There are other labor pooled capacity such as X2, X3 , X4 etc. When doing capacity levelling if the pooled capacity X1 is not available , we want to dispatch the operation to X2 or X3 . But when assigned to X3 system also shows the operation dispatched to X2 also as X2 and X3 also assigned to the same work center. How we can dispatch a labor capacity to X3 separately?