Help Costing Run!!

hello friends,

I am having a BOM with 210 items.

I want to run cost estimate for the BOM.I want to know

how and where should i manage the price of BOM items

(in which transaction i should maintain price of BOM items).

ALso let me prerequsites and procedure for running the

cost estimates .

Kindly help me

Regards

SAM

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 02, 2008 at 04:15 AM

    Hi

    You need to maintain the Price in the Costing view or the account view of the Material in the material master.

    If you have not maintained in the material master you need to mainatin the same through MR21.

    when you do a costing run using Cost Estimate with Quantity Structure CK11N, the price in the Bom Header cgets calculated based on the BOM item prices

    we then update the the price using CK24

    Please go through the link

    http://help.sap.com/saphelp_erp2004/helpdata/EN/7e/cb81ed43a311d189ee0000e81ddfac/content.htm

    Thanks & Regards

    Kishore

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 02, 2008 at 04:15 AM

    BOM item Price can be maintedned in Material Master or Purchase Inforecord. Which price to be

    considered is depends on Costing variant.

    Product Costing steps...

    Step 1:

    Header Data – Create a costing run by specifying a name. Also enter description of the same along with date for which the costing run is taken

    Finally save this data.

    Step 2:

    General Data – Select Costing Variant, Costing Version from the available options. Enter Controlling Area and Company Code.

    Step 3:

    Processing - Selection of Material

    Click on the parameter icon, which will open a new window – change parameter window. In this window enter single material code/ range of material/ multiple material code and plant code.

    Tick the field “Always Recost Material” and remove tick from background processing. After this save the data and go to the previous screen.

    Click the execute button. The status field will show a green signal if all the materials were selected correctly, else will show red signal specifying error.

    Processing – Structured Explosion

    This step will read the Bill of Material for the selected product/products. Go to change parameter window and remove tick from background processing. Save the data and go to the previous screen.

    Execute this step and the status field will show green signal for successful execution.

    Processing – Costing

    This step will create standard cost estimate for all the materials selected in Selection step and BOM exploded in structured explosion step.

    Go to change parameter window and remove tick from background processing. Save the data and go to the previous screen.

    Execute this step and the status field will show green signal for successful execution. The materials field will show total no. of materials that were costed.

    Processing – Analysis

    After costing step is over, a report is generated that enables to process and analyze the costing results. For example, compare the costing run with other costing runs or compare the costing results with a price from the material master.

    After this remove tick from background processing field in the change parameter window and return to the previous screen for executing this step.

    Processing – Marking

    This step will mark the standard cost estimate for the costed products in the previous step. If the authorization field is locked, then it is to be opened by selecting the relevant company code.

    This step would enable the results of standard cost estimate to be updated as future price in the material master.

    Go to change parameter screen to make relevant changes and then execute this step after returning to the main screen.

    Processing – Release

    This is the last step in costing run transaction. This step will update the results of standard cost estimates in the material master as the current standard price.

    It is to be noted that after releasing a cost estimate for a material in a company code, no marking or release can be carried out again for the current period. Before releasing a cost estimate, is should be made sure that the future standard prices are correct.

    Go to change parameter screen to make relevant changes and then execute this step after returning to the main screen. To verify the updated prices, check the material prices in material master.

    At every step if there is any error or warning, the log field will display it in detail.

    if useful assign points.............

    Venkat

    Edited by: VenkatSrinvas Konda on May 2, 2008 6:29 AM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.