i want to use usage decision of accept or reject only at the time of goods reciept(production). can any body pl help me how to do the same. thanx in advance....

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Apr 30, 2008 at 10:03 AM

    Hi,

    In Material Master -- > Quality Management -- > Inspection Setup.

    Add the inspection type 04 & Tick on active.

    Now if you will create a production order & do the goods receipt against this production order. The stock will move to Quality Inspection & an Inspection Lot will be generated by system.

    Against this inspection lot you can give the usage decision in Transection Code QA12.

    Hope this will help you.

    Thanks,

    Navin

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Sridhar,

      You need to perform result recording after the inspection lot is created. Please check that Inspection lot is released before you conduct the UD. In QA02, see that material specification/inspection plan are properly maintained.

      In case you want to force the inspection completion you can goto QE51--> UD or goto QA11 and record Usage decision by force completing the result recording. Here you can then accept/reject as per your procedure.

      Kiran

      Edited by: Kiran Magar on Apr 30, 2008 1:36 PM

  • author's profile photo Former Member
    Former Member
    Posted on Apr 30, 2008 at 10:52 AM

    hi

    maintain inspection type 04 so that inspection lot should be created at the time of goods receipt from production and maintained skip allowed in the detail screen of that inspection type in quality management.

    make usage decision by QA11 accepted or rejected

    Regards

    Pravin

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.