delta load problem in process chain

Hi,

I have ODS givng data to another ODS. The init of this flow was done manually...Now i have created process chain in which further processing has variant as "execute infopackage" as the delta package made .. now when i check this process chain its giving me error ""Delete init. request

REQU_49LKNGG0SE5966D3S7SQYYDQX before running

init. again with same selection"" .. Actually this is not the Init req which i ran manually..this is the req which was run when i ran this process chain... what shld i do to add only delta IP in process chain so that i dnt ve to delete init

Thanks

Prashant

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 30, 2008 at 09:39 AM

    Hi,

    Did you changed the update mode from Init to Delta update at info pack level? if not change to Delta update save the info pack and run the chain. if there is any error Init already loaded or deleted you have to delete the same from Info package -> menu bar -> scheduler -> Init option, here you have to delete and then only you can perform deltas.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 30, 2008 at 09:57 AM

    hi,

    first load all the init loads from the ods to cube. then u have to create the delta infopack and include that in the chain.

    create the int info pack under the infosource 8<ods name>

    trigger that infopack, create the delta infopack under the 8<odsname> infosource , and you have include that in the PC.

    Please do changes in your process chain.

    Local chain 1 - start -> load to ods -> activation of ods ->further processing(remove the infopack in this process maintain variant).

    Lcoal chain 2 - start -> delete index ->load delta to cube -> create index -> roll up (if needed)

    Main chain -> start -> local chain 1 ->local chain2

    Ramesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 30, 2008 at 04:15 PM

    Hi,

    Can you check the infopackage used in the variant for further update in your process chain?

    Check the update mode of that infopackage?

    I guess that the update mode has not been changed from init to delta.

    regards,

    raj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.