Problem While Executing T.CODE DP90

Former Member
0 Kudos

Hi,

We have Upgrade our system from 4.6C to ECC6.

We are facing following problem while executing Resource Related Billing request

Through Transaction code DP90.

Process.

1. We are creating Sales Order and system will create Service order automatically as per the configuration.

2. In service order we have External as well internal operations ,

Internal operations will be confirmed through IW41, and External Operations we are creating Purchase Requisition then creating PO and MIRO,

After all Operations confirmed we will make Service order status as technically completed, then we are executing DP90 for Resource Related Billing, System will determine the material, combination of Cost element and Activity Type (Which is configured in T.Code ODP1) For External Operations System is Considering Activity Type for material determination in 4.6c but it is not considering Activity Type for Material Determination in ECC6 for External Operations.

Please Help me,

Edited by: D B on Apr 29, 2008 6:13 PM

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

HI,

Problem is resolved; we are using one user exit for external operations which is not activated because of that we are getting this problem, now we activated that.

Former Member
0 Kudos

Hello,

Check the activity types are valid in the current period or not...

Prase

Former Member
0 Kudos

Hi Prashanth,

Thanks for your reply, but all activity are valid in current period, in our Scenario in the old system for External Operations with combination of Activity type and Cost element system is determining material but where as in the new system for external operations it is not considering the Activity type and system is determining the material in the combination of Cost element and Blank activity type so, we are getting different material in DP90.

Former Member
0 Kudos

Hi,

In ODP1, have you check the value assigned to the Criteria for Material determination? Have the correct values been maintained for criterion 'Activity Type' for the relevant material? If no value has been maintained, then you would definitely face this problem.

Let me have your feedback please.

Regards

Nikhilesh

Former Member
0 Kudos

HI,

Problem is resolved; we are using one user exit for external operations which is not activated because of that we are getting this problem, now we activated that.