There is a batch job at our end that creates PO from PR. But after observing in EKKO i got to see that most of the POs are created manually. just a couple of tehm are created by batch job.

I've checked the materials and vendors of the PO which were creaated manually both the places had 'Auto PO' box checked. Moreover all the PR's had a source of supply.

Please help me out why the batch job did not create almost all the POs?

Thanks,

Amit

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 29, 2008 at 03:09 PM

    Just the source of supply is not enough. Was there a info record or a contract maintained for the material and vendor? Also, was this info-record or contract assigned to in the PR or a source list maintained?

    Regards,

    lakshman

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 29, 2008 at 09:17 PM

    Lakshman has explained

    you need to have the source list setup (make sure info record exist) or contract is exist and it is assgned to the source list

    but as per your email the source is determined in the PR that means source are setup properly

    now check the variant of your back ground program of AutoPO

    if the variant is not matching with your PR's than it will not creates the PO

    so create few PR's and test it with ME59N with the background job variant and see how it is going

    some time in the variant let say you have setup the release date but if it is not matching with PR release date than it will not create the PO

    so in short you need to test same varinat online than setup for back ground.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 30, 2008 at 11:30 AM

    Dear Amit,

    You can use report RM06ME59 for release 5 or report RM06ME59_4_6 (rel 4 to 4.7)

    to check this out. The report was provided in SAP Note 786303.

    Hope this help,

    Ian

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.