Skip to Content
author's profile photo Former Member
Former Member

pipeline process

Hi gurus

while creating pipline in T-code KB1A there

Material 1612 YRPL YRLO does not exist

Message no. M7006

the above error is coming what we can do can anybody tell me

thanks in advance

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 29, 2008 at 12:00 PM

    hi

    is it MB1A ?

    if it is so then maintain or extend material to the same plant

    check the same material via MM02 once

    Edited by: MANI ROOPA SD/MM on Apr 29, 2008 2:01 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 29, 2008 at 12:03 PM

    HI

    Material 1612 YRPL YRLO does not exist

    please extend material 1612 to plant YRPL and storage location YRLO using tcode MM01

    Thanks & Regards,

    Kiran

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 29, 2008 at 12:04 PM

    pls make sure abut the tcode u have refered since i havenot heard abut KB1A.

    also clear what are YRPL YRLO means i.e. plant,storage location etc ???????

    if these r plant and storage location then u have to extend the material to the said plant and storage location thru MM01.

    regards,

    indranil

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 29, 2008 at 12:04 PM

    Hi,

    Did u cretaed material with mat. type as PIPE?Use t.code:MM60, enter ur plant and material type :PIPE and check ur material is there or not?

    In OMS2 also check PIPE setting.

    Note:Pipeline Process

    Pipeline material is a material that flows directly into the production process from a pipeline (for example, oil), from a pipe (for example, tap water), or from another similar source (for example, electricity). A material from the pipeline is always available; i.e. it can be withdrawn from the pipeline at any time and in any quantity.

    The Accounting Generated After GR/GI/Settlement are:

    1. Goods Issue

    Consumption A/C: DR

    A/c Payable For Pipeline : CR

    2. Pipeline Settlement

    A/c Payable For Pipeline : DR

    Vendor Account A/C: CR

    Regards,

    Biju K

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.